Moheshkhali – Cox’s Bazar district: Installation of a second FSRU floating terminal
Building on the success of the initial terminal, Geocean had secured a comprehensive turnkey contract for the engineering, procurement, fabrication, and installation of a second FSRU terminal in Cox’s Bazar, southeast Bangladesh.
-
Location Asia - BANGLADESH
-
Solution Transitional energy
-
Key date 2017 – 2019
-
Customer SUMMIT
Drawing from the first project’s similar challenges and specifications, Geocean innovatively established a ‘flotel’—a floating living quarters on a barge positioned along the beach throughout the project—this strategic proximity enhanced team cohesion across all nationalities, fostering unforgettable moments and engaging nightly debriefings.
Engineering, procurement, construction and installation :
- 5.5 km of import pipeline with 24″ Shore pull concrete coating.
- Eight suction anchor piles,
- 3x FSRU stern anchors
- One flexible riser and umbilical deployed in piggyback
- Underwater and onshore collectors and spools.
- Trenching
- Pre-commissioning, including drying and inerting.