Site map
Pages
Realisations
- Water Sea line
- Dam repair (inspection, cleaning, injection)
- Fresh Water Sea line
- Water Sea line
- Pipe Inspection
- Water Intake
- New Waste Water Outfall / EPCI
- New Waste Water Outfall / EPCI
- Charter – 16”OD offshore sectional pipeline relocation and installation
- Moheshkali: Installation of a floating FSRU terminal.
- Prony Bay: installation of water intake and outfall infrastructure for transporting clarified effluent
- Casablanca: installation of a wastewater outfall
- Sète: Dismantling and rebuilding of a refined product loading and unloading pipeline
- Moheshkhali – Cox’s Bazar district: Installation of a second FSRU floating terminal
- Sea-lines & Shore Approaches
- Shallow Water Pipe Lay & Shore approach
- Shallow Water Pipe Lay & Shore approach
- Shallow Water Pipe Lay & Shore approach
- Shallow Water Pipe Lay & Shore approach
- Abidjan : assistance to shore crossing for a gas pipeline
- Wilhelmshaven: Green gas terminal to receive a FSRU
- T&I Oil Field Development / Pipelay works – Gas Sea lines
- Waste Water Outfall
- Water Intakes
- Water Sea line
- Water Sea line
- Water Sea line
- New CBM
- New CBM w/ HDD
- New Waste Water Outfall
- New Waste Water Outfall
- New Waste Water Outfall / EPCI
- Pipeline and CBM replacement
- Pipeline onshore and river + PLEM + CBM
- Port-Saïd : Repairs to water supply and discharge infrastructure
- River crossings
- Sea line repair
- Sealine replacement (oil storage center)
- 12” Export Flowline Repair
- Tetiaroa : Installation of a deep-water SWAC for “The Brando” hotel
- Bora-Bora: Installation of a deep-water SWAC for the Intercontinental Hotel
- Papeete : Installation of a deepwater SWAC for the Tahiti Hospital Center
- EPCI – New SPM Terminal
- EPCI – New SPM Terminal
- Port-La-Nouvelle: Dismantling and rebuilding of a loading and unloading pipeline for refined products
- EPCI – Seme Field Development (Sea-line & CBM Terminal)
- EPCI – Waste Water Outfall
- White Product Offloading Terminal
- Antofagasta : Installation of water intake and outfall infrastructure for a desalination plant
- Pulling to shore of a 16” pipeline
- Large Water Intakes / Dredging Works
Articles
- Welcome to VINCI in the Mediterranean region
- Sustainable cooling sea water webinar
- Geocean at the Future Hospitality Summit
- Wilhelmshaven LNG Terminal : Installation of the second TCP line and the power cable
- Wilhelmshaven LNG Terminal : Installation of the PLEM
- Geocean at GasTech 2024 in Houston
- Wilhelmshaven LNG Terminal project : Installation of the first TCP bundle
- Wilhelshaven LNG Terminal : loading thermo-composite pipe
- Wilhelmshaven LNG terminal : First step validated !
- New Milestone for Geocean in French Polynesia
- Marine XII: Geocean signs a new contract to install the FLNG mooring system in Congo
- New contract for the installation of new LNG offshore terminal in Germany