Le 24 September 2024
Wilhelmshaven LNG Terminal : Installation of the second TCP line and the power cable
We’re approaching the conclusion of our joint journey in Wilhelmshaven.
Today, we share the successful installation of the last three Thermo Composite Pipe (TCP) lines using our Geocean Fast-Flex barge, terminated by the second PLEM. These are parts of the jettyless IQuay F-Class – An original configuration by ECOnnect Energy for fast track LNG.
During this project stage, the power and fibre optical cable were also installed between the mooring jetty and the shore.
This final milestone concludes Geocean’s installation work on this new LNG terminal, provided by ECOnnect Energy, enabling Germany to secure and diversify its gas supply.